New Vic Concept

InfoConstruction

Keeping communities informed.ÌýMinimizing disruptions.ÌýProtecting teaching and research integrity.

´ó·¢²ÊƱƽ̨

Road closure calendar

This table indicates the on-going work of the Société québécoise des infrastructures (SQI), Ville de Montreal, ´ó·¢²ÊƱƽ̨/The New Vic Project/ Facilities Management and Ancillary Services (FMAS)/Montreal Neurological Institute-Hospital (Neuro) and the Ville de Montréal.

DATES MANAGED BY STREET NAMES TYPE OF CLOSURE NOTES
January 6 to end of May, 2025 ´ó·¢²ÊƱƽ̨/New Vic

University between Des Pins and the Neuro bridge

Partial closure

New Vic Project. Services should not be affected.

No detours expected

Feb 27- end of May, 2025 ´ó·¢²ÊƱƽ̨/Neuro University, main entrance to Neuro, above Des Pins Partial closure

Neuro project – services should not be affected.

No detours expected

(Last update:Ìý MarchÌý14, 2025)

Ìý

Looking for more information on road closures around the larger Montreal area? Visit the .

Ìý

Plans and progress

Work underway

  • Securing and restoration of the façades of Pavilions A, E and L
  • Structural demolition of the back of Pavilion A
  • Deconstruction of Pavilions M and S

Ìý

Plans

´ó·¢²ÊƱƽ̨ Pavilions - Aerial View
´ó·¢²ÊƱƽ̨ Pavilions - Aerial View

Worksite Plan
Worksite Plan

Worksite Plan - ´ó·¢²ÊƱƽ̨ Pavilions
Worksite Plan - ´ó·¢²ÊƱƽ̨ Pavilions

Ìý


P1 Parking, triage of material


Demolition of the back of Pavilion A


Securing of the facades, Pavilion E

Ìý

The next 6 months

  • Excavation and geothermal work
  • Continuation of the masonry restoration work of heritage buildings A, E and L
  • Infrastructure work on University street for a new permanent electrical entry

Community impact mitigation measures

Noise

Noise-generating work will be carried out in accordance with current municipal regulations:

  • Monday to Friday: 7 a.m. to 7 p.m.
  • Saturday: 7 a.m. to 7 p.m. (when required)
  • Sunday: No work

Vibration

  • Vibration limitations have been imposed on contractors. Their work methods will be adapted to comply with these limits.
  • Installation of 27 seismographs for continuous vibration monitoring.
  • Seismographs will be added around the site (south side of Avenue des Pins, east side of University Street).
  • Establishment of a threshold to be respected for highly sensitive buildings: historic and protected structures or already deteriorated structures.

Dust

  • Street cleaning with mechanical broom
  • Use of water to suppress dust during deconstruction of concrete structures

Latest news

News regarding work progress will be published here.

Contact information

New Vic Project Office
772 Sherbrooke Street West, 2ndÌýfloor
Montreal, Quebec H3A 1G1

Email:Ìýnew.vic [at] mcgill.ca

´ó·¢²ÊƱƽ̨ is on land which has long served and continues to serve as a site of meeting and exchange amongst Indigenous peoples, including the Haudenosaunee and Anishinabeg nations. We acknowledge and thank the diverse Indigenous peoples whose presence and contribution mark this territory on which peoples of the world now gather.